Skip to main content
Administrator Guide
Laatst bijgewerkt: 2023-06-23
Create Minimum Rest Calculations

Create Minimum Rest Calculations

  • Create predictive scheduling configurations.
  • Create a calculation tag to use in minimum rest calculations.
  • Security:
    Set Up: Time Calculations
    domain in the Time Tracking Calculations functional area.
A minimum rest calculation tags time blocks worked during a specified rest period. You can use minimum rest calculations to handle laws that require you to pay a premium if workers lack sufficient rest time between their shifts.
  1. Access the
    Create Time Calculation
    task.
  2. For
    Calculation Type
    , select
    Minimum Rest Calculation
    .
  3. As you complete the
    Criteria
    section, consider:
    Optie Omschrijving
    Predictive Scheduling Configuration
    Select an existing predictive scheduling configuration or create a new one.
    After you select a configuration, Workday displays the
    Allowed Out Types
    and
    Minimum Rest Hours After Last Out
    fields. These fields are generated from the predictive scheduling configuration and can only be edited on the
    Edit Predictive Scheduling Configuration
    task.
    Minimum Rest Grace Period after Last Out
    Define a grace period that begins after a worker's out. During the grace period, Workday won’t apply the minimum rest time calculation tag to time blocks.
    You can use the grace period to ensure that workers who check out for a short break don't qualify for the minimum rest premium.
    Example: You set a grace period of 2 hours. A worker checks out of work for a 1-hour break using the Out type you defined on the predictive scheduling configuration. The worker returns to work 1 hour later. Workday doesn't tag these time blocks with the minimum rest calculation tag because the worker's 1-hour break was within the 2-hour grace period.
  4. In the
    Results
    section, select the time calculation tags to add to or remove from the eligible time blocks.
  5. On the
    Groups
    tab, select
    Time Calculation Groups
    to specify which workers are eligible for the calculation.
  6. On the
    Advanced
    tab, in the
    Do Not Modify
    field, select time calculation tags that you don't want Workday to modify.
Assign time calculation priorities.