Generate Periods for Period Schedules
Security:
Modify
access to at least 1 of these domains:
- Set Up: Payroll (Pay Group Specific)in the Core Payroll functional area.
- Set Up: Payroll Interfacein the Payroll Interface functional area.
- Set Up: Period Schedulein the Project Tracking functional area.
- Set Up: Time Off (Calculations - Absence Specific)in the Time Off and Leave functional area.
- Set Up: Time Trackingin the Time Tracking and Time Tracking Hub functional areas.
Create a period schedule with at least 1 period configured within it. For more information, see Set Up Payroll and Time Tracking Period Schedules.
After creating a period schedule with at least one existing period, you can automatically generate future periods up to two years from the current date. Workday calculates the maximum allowed periods based on this 2-year limit to prevent submission errors.
The
Generate Period Schedule Periods
task automatically defines the Period Start Date
, Period End Date
, and Payroll Payment Date
for generated periods. When you enable continuous payroll calculation, the task also defines dates and times for the initial calculation and the automatic stop.- Access theGenerate Period Schedule Periodstask.
- Select a period schedule.
- Enter theNumber of Periods to Generate.
- (Optional) Enter a value in theDays from Period End Date to Payment Datefield. Otherwise, the value corresponds to the existing period schedule.When weekend auto-adjust settings or a holiday calendar shift a payment date, Workday displays theAdjusted Payment Datecolumn in thePeriods to Generategrid with a selected check box. This column remains hidden if no payment dates are adjusted.
- (Optional) Enter dates for Time Tracking.Enter dates relative to the period start date or period end date. Example: If the open time entry date is the date:
- Before the period start date at noon, enter-1and12:00 PM.
- Of the period start date at midnight, enter0and12:00 AM.
If you don't change the date default of 0, and you leave the time default blank, this indicates non-usage of the field. Example: If unlock for adjustments isn't applicable, then leaveDays from Period End Date to Unlock for Adjustmentswith the defaulted value of 0 andUnlock for Adjustments Timeblank.Time is in Pacific Standard Time (PST).
Workday adds the periods you configured to the existing period schedule.
Assign pay period schedules to pay groups. For more information, see Set Up Pay Groups.
To ensure that workers don't qualify for more than 1 period schedule, periodically review the
Audit - Workers with Multiple Time Period Schedules
report.