Create Labor Mapping Rules
Security:
Set Up: Labor Optimization: Labor Mapping Rules
in the Labor Optimization functional area.You can use the
Create Labor Mapping Rules
task to configure rules that predict labor demand for a Scheduling Organization (SO). - Configure theSet Up: Labor Optimization: Labor Mapping Rulessecurity domain.
- Access theCreate Labor Mapping Ruletask.
- Enter a date from which the rule takes effect using theEffective as offield.Specifying an effective date for a rule creates a snapshot for the new date.
- (Optional) To apply this rule to a smaller group of workers within a scheduling organization, select aScheduling Subgroup Organization.
- Select theSchedule Tag Valuesthat this rule will apply to.Example: You want to create a rule for Cashiers in the Stockton location, so you selectCashierinSchedule Tag 1andStocktoninSchedule Tag 2.
- (Optional) Create Volume-Based Labor Demand Rules.Also known as weighted metric rules, volume-based labor demand rules are used to predict labor demand based on specific metrics and their associated thresholds. When configuring a volume-based labor demand rule, you define a metric, weight, and tier rule. A tier rule determines whether Workday uses the Labor Demand Quantity when the metric reaches or exceeds the specified Minimum Value Threshold.
- As you complete the fields, consider:OptionDescriptionWeightEnter a percentage to assign to each metric, indicating its influence on the overall labor demand prediction.Note: The sum of all weights for metric-based rules in a single labor mapping rule must equal 100%.MetricSelect the measure (such as sales volume or customer count) that drives labor demand from the metrics you’ve configured in Workday. Each metric can only be used once per rule.Minimum Value ThresholdThe values you enter in the Minimum Value Threshold and Labor Demand Quantity fields work together to create a tier rule.TheMinimum Value Threshold Valueacts as a trigger or condition. When you specify a value in this field (Example: 100 sales), and the actual metric (such as your sales) reaches or is greater than this value, the tier rule is triggered and Workday uses the associatedLabor Demand Quantityvalue.Labor Demand QuantitySpecify the amount of labor demand that Workday must generate when the associated metric meets or exceeds theMinimum Value Threshold Value. This is the output value that Workday uses to predict labor demand when the metric's value satisfies required conditions.
- (Optional) Create Fixed-Activity Labor Demand Rules to account for labor demand generated by specific, predefined activities that aren’t directly associated with a fluctuating metric.As you complete the fields, consider:OptionDescriptionFixed Labor ActivityAdd existing fixed labor activities. Each activity can only be used once per rule. See: Create Fixed Labor ActivityLabor Demand QuantityAssign a labor demand quantity for the selected fixed labor activity. WhenAllow Zero Duration Fixed Task Standardsis enabled, a value of zero is allowed in this field. This means that no labor demand is created for this specific activity.
- (Optional) Create Task-Based Labor Demand Rules to specify the amount of time it typically takes to complete various metric-based or fixed duration tasks and activities.As you complete the fields, consider:OptionDescriptionTask TypeSelectMetric Based Taskwhen you want to determine how much time is needed per unit of the metric.SelectFixed Duration Taskto specify a total duration (hours, minutes, seconds) for the task.Task IntervalSpecify the forecasting interval for the task and its available values depend on the Task Type.For a fixed duration task, the allowed values are Daily and Weekly.For metric-based tasks, the allowed values are:
- Daily
- Weekly
- 15 Minutes
- 30 Minutes
- 60 Minutes
MetricFor a metric-based task, you can select a specific metric (such as sales or customer count) that drives the labor demand for this task.RateFor a metric-based task, enter the amount of time required (in hours) to complete the task per unit of the selected metric.To enter less than an hour, you can use a decimal value. Example: 0.5 for 30 minutes.OffsetFor a metric-based task, you can use this field to adjust the timing of the labor demand relative to the metric. If enabled, you can specify:- Direction: Whether the offset is forward or backward.
- Interval Offset: The number of intervals by which the demand is shifted.
Advanced ConditionsFor a metric-based task, typically when you selectDemand Period Lengthas theTask Interval, you can configure a condition based on the metric value.It includes:- Operator: Such as less than or greater than.
- Metric Value: The value against which the metric is compared.
Total DurationFor a fixed-duration task, specify the total time needed to complete the task in hours, minutes, and seconds.Distribution HoursFor a fixed-duration task, you can use this section to determine how the total duration of the task is distributed.- Static Times: Requires a specificStart TimeandEnd Timefor the task.
- Operating Hours-Based Times: RequiresStart Hours,Start Minutes,End Hours,End Minutes, andWhenvalues (Example: At Open, Before Close) to align the task with the organization's operating hours.
Day(s) of the WeekFor a fixed-duration task with aTask Intervalset toWeekly, you can use this field to select specific days of the week for the task.Distribution TypeFor both fixed-duration and metric-based tasks, you can choose how labor demand is distributed across the day or week:- Evenly Distributed Across Intervals: Evenly distributes labor demand across a time interval and doesn’t account for metric forecasts.
- By Metric Forecast: Distributes labor demand across a day or week according to a specific metric forecast for that day or week. Example: You distribute labor demand across a day for a restaurant according to the forecasted number of tables that will need service each hour, ensuring that there is more labor demand during the busier lunch hours and less during the late afternoon.
- (Optional) Create a flexible task to augment the functionality of fixed-duration tasks.A flexible task is a task which can be completed at any time in a day, rather than during a particular interval of time. Flexible task rules are a more efficient way of distributing labor that leverages labor demand which otherwise would have been subject to rounding or minimums.
- As you complete the fields, consider:OptionDescriptionTask IntervalSpecify the forecasting interval for the task. Common values are Daily and Weekly.Total DurationSpecify the total time needed to complete the task, typically in hours, minutes, and seconds.Flexible DistributionSpecify how Workday distributes any excess or remaining labor.Common options are:
- From the Start: Distributes labor from the beginning of the period.
- From the End: Distributes labor towards the end of the period.
- (Optional) Select aLabor Demand Rounding Ruleto establish how Workday handles fractional (decimal) numbers when calculating the final labor demand.OptionDescriptionRound to nearest 1By default, Workday rounds to the nearest whole number. Example: When the calculated labor demand is, 3.4, Workday rounds down to 3. When it's 3.6, Workday rounds up to 4.Round up to nearest 1Example: When the demand is 3.1 or 3.9, Workday rounds up to 4 in both scenarios. This is useful when you want to ensure you always have enough staff.Round down to nearest 1Example: When the demand is 3.1 or 3.9, Workday rounds down to 3 in both scenarios.
- ClickOK.