Add Relative Time Periods
- An existing Google Sheets report with Adaptive Planning data.
- Security:Access to Workday for Google Sheetspermission.
You can add time as absolute (fixed) or relative (offset from
Report Date
). Relative elements stay in the builder as stratum plus offset. You can move or remove them the same way as other elements under Time
.- Open an existing Adaptive Planning report in Google Sheets.
- In the Workday add-on, addTime.
- Select theMake Relative to Report Datecheck box.Leave it cleared to add absolute time. The time tree matches the instance calendar.
- Select the time periods to add.
- ClickRefresh.
The builder lists relative elements under
Time
with labels such as Quarter (-2)
. The sheet shows resolved period labels.