Set Up Shared Costs of Assets
- Register an asset.
- Configure theAsset Share Eventbusiness process and security policy in the Business Asset Tracking functional area.
You can set up registered assets to share costs. You can't share the cost of assets that
are:
- Components of a nondiscrete composite asset.
- Discrete composite assets.
- Disposed or removed.
You can't make changes to assets when other events are in progress.
- Access theMaintain Asset Sharestask from the related actions menu of an asset.
- As you complete the task, consider:
Optie Omschrijving Amount SplitEqual to the sum of theAsset Share Amountvalues for all share lines.Amount to be SplitThe total asset cost. The amount changes as you add rows and enter theShare PercentorAsset Share Amount. The finalAmount to be Splitvalue must be zero.Share PercentWhen you adjust the asset cost or accounting, Workday uses the percentage to determine the amounts to apply to each line of the shared asset.Asset Share AmountDisplays the shared amount for each line. The sum of all lines is equal to theAmount Splitvalue.Asset ClassAsset TypeYou can select the sameAsset ClassorAsset Typeon more than 1 row.TheAsset ClassorAsset Typeyou select overrides your previous selections.WorktagsGebruik worktags als trefwoorden om transacties gemakkelijker te classificeren en te vinden. Configureer de toegestane worktagtypen voor de taakWorktaggebruik onderhouden. Wanneer u een worktagtype met gerelateerde worktags selecteert, vult Workday transacties automatisch met de gerelateerde worktagwaarden.When you Submit, Workday validates that you have selected allowed or required values based on your related worktag configuration.
Review shared asset line splits to determine accounting cost sharing and the share of
costs related to lifecycle events. Select the
Asset Shares
link on the View Business Asset
or View Asset by
Book
tasks.Create custom reports for the single asset and drill down to view the shared cost
details. You can report by:
- Asset cost.
- Asset class.
- Asset type.