Concept: Actual Enrollment Usage Start Date
The Actual Enrollment Usage Start Date (AEUSD) is a critical date control in Workday for standard academic periods. Based on this date control, Workday determines when to stop using a student’s projected load status and begin using their actual load status for financial aid processing, which affects cost of attendance (COA), packaging, disbursement, and other downstream processes. You can set the AEUSD for an academic period using the
Maintain Academic Period Date Controls
task.
We recommend setting your AEUSD as early as possible, or at the latest 2 days before the date occurs. If the AEUSD has passed when nightly orchestration runs, students will be omitted from AEUSD-related processing.
Successful AEUSD processing relies on Workday’s Reaction Framework, which recognizes a value change between a student’s projected load status and their actual load status, then initiates reprocessing of COA and merit or need packaging.
Attendance Plan
On the
Attendance Plan
report of a student’s Financial Aid profile, Workday automatically changes the value of the Actual Enrollment
field on the Load Status
tab from No
to Yes
, indicating only that the AEUSD has been reached for the period.Student Nightly Job Orchestration
All AEUSD processing occurs during the Student Nightly Job Orchestration, which begins at 1:00 A.M. tenant time and runs a set order of jobs. Each job relies on previous jobs to both refresh and flag certain financial aid data to ensure updated student records.
These jobs in the nightly orchestration affect AEUSD processing:
Job
| Description
|
|---|---|
Financial Aid Date-Based Processing | As the first job in the nightly orchestration, this job flags certain financial aid processing once date controls are reached. Once the AEUSD is reached, this job flags the following changes:
At this point in the nightly orchestration, Workday has set the flags that subsequent jobs will pick up in the same instance of nightly orchestration. |
Refresh Attendance Plans | This job processes records with Class Standing or Load Status refresh flags set in the Financial Aid Date Based Processing job and clears those flags. For the AEUSD, it’s important to have an accurate load status that’s reflective of all current, actual enrollment, as Workday uses this information to process financial aid for the remainder of the academic period. |
Assign Cost of Attendance | This job processes records with COA reevaluation flags set by the Financial Aid Date Based Processing job and clears those flags. Note that Workday doesn’t refresh all flagged records through the COA job. Instead, Workday reevaluates the records through the Reaction Framework to determine how to process any changes that occurred.
When a change occurs, Workday initiates these processes according to the reaction method configured on the associated reaction policy:
|
Package Merit Financial Aid | Operates like the Assign Cost of Attendance job, but with the Merit Packaging Reaction Review report. |
Package Need Financial Aid | Operates like the Assign Cost of Attendance job, but with the Need Packaging Reaction Review report. |
Disburse Payments | Disburses eligible awards based on your configuration. |
Use Case
In the example outlined below, Workday automatically adjusts a student's financial aid package on the AEUSD to account for their change in load status.
Prerequisites:
- Set the AEUSD for January 16.
- Set up reactions for need and merit packaging.
- Enable aReaction ReasonofAutoand aManual Review Date ControlofActual Enrollment Usage Startfor the Academic Period (POS) Load Status reaction reason.
Date | Event |
|---|---|
January 1 | A financial aid administrator runs the Run Student Financial Services Processes by Student report to create the initial packaging instance for a student enrolled full time.
|
January 9 | The student changes their load status to Half-time . |
January 16 | When the AEUSD is reached at 12:00 A.M.:
|