Skip to main content
Administrator Guide
Last Updated: 2023-06-23
Concept: Merged Services

Concept: Merged Services

When you enable the
Manage Multiple Services as a Single Project
functionality:
  • Workday merges services with the same project hierarchy into a single project downstream, even if they have different billing models.
  • When there are no common project hierarchies across services in a quote, Workday creates individual projects for each.
  • Workday validates that the
    Rate Type
    matches across all merged services. When the
    Rate Type
    is
    Days
    , the merged services must use the same
    Project Billing Rate Sheet
    .
The downstream behavior of how services are converted into a project is determined by the
Manage Multiple Services as a Single ~Project~
flag setting at the time of quote creation. When you change the tenant setting on the
Maintain Services CPQ Settings
task, it will only impact the newly created quotes. Existing quotes will retain the behavior from the flag setting during the quote creation.

Downstream Impact on Projects

When the primary quote status changes to
Approved
, Workday creates an opportunity project. In the opportunity project:
  • The
    Project Name
    is 
    Quote Name + Project Hierarchy
    .
  • When the merged services flag is not enabled, the Service Name becomes the Project Name
  • The
    Opportunity Project Description
    is a comma separated list of the service names in that project.
  • The
    Start Date
    of the project is the same as the earliest date of the merged services and the
    End Date
    of the project is the same as the latest date of the merged services.
  • All role lines of the merged services convert to individual resource plan lines in the project.
  • The resource forecast reflects all role lines of the merged services.
  • The
    Probability of Success
    report field derives the value from an open and active opportunity from a quote.

Downstream Impact on Contracts

Based on the
Opportunity Event
business process configuration, a change in opportunity details including status, probability, salesperson, or close date creates a customer contract with these conversions:
  • The contract
    Effective Date
    is the same as the project
    Start Date
    .
  • All role lines of merged services with the same
    Billing Model
    type (Fixed Fee or Time and Expense) convert to a single contract line for labor.
  • All expense lines of merged services with the same
    Billing Model
    type convert to a single contract line for expense.
  • All third party lines of merged services with the same
    Billing Model
    type convert to a single contract line.
  • The item and discount lines for each service do not merge to a single contract line and display as separate lines.
  • When the merged services have different billing methods, Workday continues to merge them into a single project but creates separate contract lines for each billing method.
    Based on how you've configured the quote contract and contract line mappings for labor lines in your tenant, the contract specialist might need to either remove the contract rate sheet for one of the lines or add separate phases for each billing method to differentiate the lines.
Contract line date considerations:
For
From Date
To Date
Role, Third Party and Expense lines
=  Project Start Date
=  Project End Date
Non-Recurring item lines
= Item Start Date
= Service End Date
Recurring items
= Recurring Item Start Date
= Service End Date
Discount lines
= Service Start Date
= Service End Date