Reference: Billing Rate Rule Types for Projects
Workday provides 7 billing rate rule types for use in project billing. You can apply the
rules and settings you configure on the contract rate sheet to project time and
expense transactions. The contract rate sheet calculates the project billing rate at
a given point in time. You can also define a
Reset Option
for
some rules to enable you to reset contract rates periodically throughout the
contract term.When you add rule types to a group:
- Workday applies the override rate rules first and cap rules last.
- You can have multiple rules per billing rate rule type.
- You can have only 1 of each billing rate rule type in your set.
- You can order the rules within each group.
Billing Rate Rule Type
| Description
| Reset Option
| Example
|
|---|---|---|---|
Expense Caps (Expense) | Sets a cap on total expenses for a project or specific expense
category. | Yes |
|
Override Rate (Expense) | Sets an override rate as:
| Not Applicable |
|
Override Rate (Misc Expense) | Sets an override rate on miscellaneous expenses as a percentage (either
a markup or discount) or as an amount on these dimensions:
| Not Applicable |
|
Override Rate (Supplier Invoice) | Sets an override rate on supplier invoices as a percentage (either a
markup or discount) or as an amount on an expense category. | Not Applicable |
|
Override Rate (Time) | Sets an override rate as a percentage (either a mark up or a discount)
or as a specific hour or amount on these project dimensions:
| Not Applicable |
|
Project Cap (Time) | Sets a limit on each project dimension or to the entire project over
time. | Yes |
|
Tiered Rate (Time) | Sets different rates based on tiers (hours or amounts). | Yes |
|