Create Schedules
- Shared matrix or model reports
- Security:
- Create Shared Reportspermission
- Create Report Schedulespermission
- Send Notificationspermission. You need this permission only if you want to notify other people besides you.
From the shared or favorite report folders, you can schedule:
- Matrix and model report snapshots with optional notifications.
- Live matrix and model report notifications.
The scheduled snapshots display data based on the access of the schedule creator and not the recipient.
You can create a maximum of:
- 100 schedules per instance.
- Twenty concurrent schedules to run at the same time.
- SelectReportsfrom the main menu.
- From theSharedfolders, click theActions menu(3 vertical dots) for a matrix or model report and selectCreate Schedule.
- Specify the schedule details such as name, cadence, and time. Select an end date to expire your schedule and minimize unused schedules.Adaptive Planning populates these values:
- The report name prefixed with "Schedule -".
- Your local time zone.
- ForAction, select either of these options and clickNext.
- Create Snapshot
- Send Live Report Notification
- (Optional) If you selected theCreate Snapshotoption, specify the snapshot details. As you complete the task, consider:
選項 說明 ToSpecify the recipients (users, groups, or levels) for the scheduled snapshot report. If you don’t specify any recipients, only the scheduler has access to the report snapshot.Snapshot NameSpecify the name of the scheduled snapshot report.Default OutputSelect the format for viewing the report.Level Parameter OptionsIf the report includes level parameters, select this option to include all levels up to a maximum of 500 from the live report into the snapshot.Contains Salary InfoSelect the option to enable users to view the scheduled snapshot report only if they have theAccess Salary Detailpermission.Save InSelect the shared folder where you want to save the scheduled snapshot report.NotifySelect the option to notify the specified recipients and direct them to the results of the report content. If you don’t notify, the snapshot report becomes available from the shared folder location you specify.MessageIf you want to notify people, specify a message to include in the notification for the scheduled snapshot recipients. - (Optional) If you selected theSend Live Report Notificationoption, select the recipients and specify a message for the notification.
- ClickSaveto save the schedule.